ASPALINK company: the construction of a temporary bridge in Becusse has reached 80%
DILI, 2 august 2022 (TATOLI)– The temporary bridge constructed by the ASPALINK company in Becusse has reached 80% of the construction process, said I Jin Filipe, Director of the
